Bus Stop:
Buses en-route:
- 22 minutes,2.1 miles away Vehicle 5793
- 54 minutes,4.8 miles away (at terminal) Vehicle 5936
- 59 minutes,4.9 miles away Vehicle 5881
- 19 minutes,1.9 miles away, ~62 passengers on vehicle Vehicle 6067
- 28 minutes,2.7 miles away Vehicle 5814
- 7.8 miles away (+ layover, scheduled to depart terminal at 3:32 PM) Vehicle 5316
M34A-SBS SELECT BUS WATERSIDE via 34 ST via 2 AV
- 21 minutes,2.0 miles away (at terminal) Vehicle 5457
- 32 minutes,2.6 miles away (+ layover, scheduled to depart terminal at 3:20 PM) Vehicle 5585
M34-SBS SELECT BUS WATERSIDE via 34 ST via 2 AV
- 24 minutes,2.3 miles away (+ scheduled layover at terminal) Vehicle 5502
No buses en-route to this stop for:
M9 to BATTERY PK CITY via AVENUE C via PK ROW
(check back shortly for an update)
Service Alert:
- M15 stops on South St at Whitehall St will be bypassed, the first and last stops will be made on Whitehall St at Water St
What's happening?
DOT Construction - Battery Park
Note: Bus arrival information may not be available/accurate while buses are detoured
- Southbound M15 buses will detour to Lexington Ave from E 56th St to E 42nd St
The last regular stop before the detour will be 2nd Ave/E 61st St. The first regular stop after the detour will be 2nd Ave/E 41st St.
Buses will make requested stops along Lexington Ave.
Skipped stops:
2nd Ave/E 56th St
2nd Ave/E 54th St
2nd Ave/E 50th St
2nd Ave/E 46th St
What?s happening?
Nigerian Independence Day Festival and Parade
Note: Bus arrival information may be unavailable or inaccurate while buses are detoured.
- Northbound M15 stop on 1st Ave at E 77th St is being bypassed
Please use the stops on 1st Ave at E 75th St or E 81st St instead.
What's happening?
Construction
- Southbound M15 stop on E 106th St is closed; buses are making a temporary stop on 2nd Ave between E 107th St and E 106th St.
What's happening?
Construction
Note: Bus arrival information may not be available/accurate while buses are detoured
- Northbound M9 buses are detoured due to construction at Warren St/West St.
Northbound buses will not serve stops on Warren St from Greenwich St to Church St.
While detoured, stops will be made as requested along Chambers St.
NOTE: Bus arrival information may not be accurate/available while buses are detoured.